Are Your Roads Broken Up Over Spring
Thaw?
|
||||
|
WE CAN HELP
|
||||
|
|
|||
| These are caused by an unstable and inconsistent road base. What causes instability? EXCESSIVE MOISTURE does. Most any road base material will stabilize when excess moisture is removed, providing a firm footing for any road surface year-round. We accomplish this with ROAD UNDERDRAIN. | ||||
![]() |
||||
| Stone back-filled drain tile laid by our
laser-guided drainage plow equipped with a special boot removes excess moisture
from the road base, eliminating all moisture related problems. The clean
stone back-fill provides faster vertical movement of water through the compacted
base to the drain tile. An 18" to 24" buffer of the original road
base material remains above the stone to maintain base consistency and eliminate
dips from differing base material. |
||||
| Road Underdrain is normally installed during the rebuilding or resurfacing process on paved roads, or anytime on gravel roads. | ||||
|
||||
| Road Underdrain can save you money. With
repaving costs approaching $30,000, you need to make that new surface last.
Draining stabilizes the road base. A stable base make for a smooth, stable
surface, extending surface life. Road Underdrain can pay for itself in as
little as 18 months! |
||||
| Don't waste any more money repaving unstable
roads! Let us get to the bottom of your problem with ROAD UNDERDRAIN. |
||||
|
Past and Present Projects
|
|
|
28 miles of road sub-drainage in various
locations!
|
|
|
Special Projects:
|
|
|
12-94
|
Dorsch Ford |
|
9/97
|
S&L Motors Parking Lot Underdrain New Construction |
|
10-93 to 8/97
|
Richco Structures Storage Yard Underdrain Existing Facilities - various locations |
|